The Japan Times - NASA's Tuesday Moon launch threatened by storm

EUR -
AED 4.381992
AFN 78.750894
ALL 96.772834
AMD 453.127673
ANG 2.135904
AOA 1094.155023
ARS 1723.006224
AUD 1.703048
AWG 2.147741
AZN 2.027312
BAM 1.958039
BBD 2.409237
BDT 146.15714
BGN 2.003807
BHD 0.449939
BIF 3543.827792
BMD 1.193189
BND 1.513334
BOB 8.264659
BRL 6.197065
BSD 1.196143
BTN 110.049154
BWP 15.598819
BYN 3.379033
BYR 23386.513916
BZD 2.405733
CAD 1.613288
CDF 2693.62495
CHF 0.916376
CLF 0.025958
CLP 1024.95004
CNY 8.290757
CNH 8.289248
COP 4358.721191
CRC 591.863639
CUC 1.193189
CUP 31.619521
CVE 110.393555
CZK 24.34441
DJF 213.004295
DKK 7.467153
DOP 75.15697
DZD 154.308073
EGP 56.001272
ERN 17.897842
ETB 185.122907
FJD 2.620781
FKP 0.864978
GBP 0.867162
GEL 3.215635
GGP 0.864978
GHS 13.067272
GIP 0.864978
GMD 87.697079
GNF 10497.500171
GTQ 9.177688
GYD 250.242459
HKD 9.315768
HNL 31.595737
HRK 7.533438
HTG 156.800337
HUF 381.275947
IDR 20028.222449
ILS 3.690338
IMP 0.864978
INR 109.703873
IQD 1563.674821
IRR 50263.107265
ISK 144.99605
JEP 0.864978
JMD 187.688003
JOD 0.845975
JPY 183.732053
KES 154.243589
KGS 104.344067
KHR 4800.801608
KMF 491.594467
KPW 1073.96939
KRW 1718.932363
KWD 0.365955
KYD 0.996727
KZT 600.839544
LAK 25677.437566
LBP 107117.524012
LKR 370.074058
LRD 221.3444
LSL 18.780413
LTL 3.523179
LVL 0.721749
LYD 7.487269
MAD 10.834074
MDL 20.11961
MGA 5321.625216
MKD 61.62671
MMK 2505.752956
MNT 4256.95142
MOP 9.615976
MRU 47.572579
MUR 54.20683
MVR 18.434798
MWK 2072.570214
MXN 20.625111
MYR 4.698727
MZN 76.065949
NAD 18.864464
NGN 1658.366152
NIO 43.187477
NOK 11.432366
NPR 176.101211
NZD 1.969586
OMR 0.458787
PAB 1.196098
PEN 3.989425
PGK 5.083586
PHP 70.333154
PKR 333.88428
PLN 4.210294
PYG 8026.784566
QAR 4.344522
RON 5.097187
RSD 117.389486
RUB 90.086234
RWF 1733.107728
SAR 4.475517
SBD 9.614842
SCR 16.593195
SDG 717.661496
SEK 10.535953
SGD 1.512051
SHP 0.895201
SLE 29.08404
SLL 25020.586042
SOS 681.867426
SRD 45.34538
STD 24696.61331
STN 24.609533
SVC 10.465837
SYP 13196.168479
SZL 18.855865
THB 37.48407
TJS 11.171609
TMT 4.188095
TND 3.373445
TOP 2.872914
TRY 51.903862
TTD 8.118318
TWD 37.534758
TZS 3072.463155
UAH 51.192889
UGX 4254.972804
USD 1.193189
UYU 45.262709
UZS 14550.945781
VES 437.717685
VND 30924.48849
VUV 142.715687
WST 3.23879
XAF 656.694211
XAG 0.011511
XAU 0.000235
XCD 3.224654
XCG 2.155638
XDR 0.816792
XOF 653.27021
XPF 119.331742
YER 284.461217
ZAR 19.03704
ZMK 10740.145808
ZMW 23.653834
ZWL 384.206528
  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    1.3800

    83.78

    +1.65%

  • CMSC

    0.0100

    23.71

    +0.04%

  • NGG

    0.3900

    85.07

    +0.46%

  • RYCEF

    -0.0700

    16.88

    -0.41%

  • RELX

    -1.2100

    36.17

    -3.35%

  • GSK

    0.5600

    50.66

    +1.11%

  • RIO

    1.7600

    95.13

    +1.85%

  • BCE

    0.2200

    25.49

    +0.86%

  • CMSD

    0.0392

    24.09

    +0.16%

  • BCC

    -0.5500

    80.3

    -0.68%

  • AZN

    -0.6300

    92.59

    -0.68%

  • JRI

    -0.0500

    12.94

    -0.39%

  • VOD

    0.1400

    14.71

    +0.95%

  • BTI

    0.0600

    60.22

    +0.1%

  • BP

    0.3400

    38.04

    +0.89%

NASA's Tuesday Moon launch threatened by storm
NASA's Tuesday Moon launch threatened by storm / Photo: CHANDAN KHANNA - AFP/File

NASA's Tuesday Moon launch threatened by storm

NASA's historic uncrewed mission to the Moon is facing fresh difficulties.

Text size:

After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realized we also need to be really paying attention and thinking about a plan B."

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometers per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

Y.Ishikawa--JT