The Japan Times - NASA eyes two more dates in September for possible Moon launch

EUR -
AED 4.228897
AFN 72.544603
ALL 96.183662
AMD 434.229157
ANG 2.061288
AOA 1055.928483
ARS 1608.200783
AUD 1.625385
AWG 2.075586
AZN 1.956154
BAM 1.959533
BBD 2.316513
BDT 141.128872
BGN 1.968276
BHD 0.434856
BIF 3414.980192
BMD 1.151504
BND 1.471235
BOB 7.976196
BRL 6.034567
BSD 1.150196
BTN 106.089037
BWP 15.682946
BYN 3.426227
BYR 22569.474238
BZD 2.313207
CAD 1.576633
CDF 2608.156684
CHF 0.906193
CLF 0.026536
CLP 1047.776192
CNY 8.010147
CNH 7.929762
COP 4265.757296
CRC 540.24567
CUC 1.151504
CUP 30.51485
CVE 110.475953
CZK 24.447343
DJF 204.811085
DKK 7.472275
DOP 70.205887
DZD 152.237997
EGP 60.200932
ERN 17.272557
ETB 181.174658
FJD 2.547069
FKP 0.865734
GBP 0.863685
GEL 3.131737
GGP 0.865734
GHS 12.518905
GIP 0.865734
GMD 84.639353
GNF 10083.517103
GTQ 8.815834
GYD 240.758681
HKD 9.02418
HNL 30.449068
HRK 7.536477
HTG 150.750475
HUF 391.080654
IDR 19547.928299
ILS 3.595824
IMP 0.865734
INR 106.424571
IQD 1506.670433
IRR 1521194.078995
ISK 143.201496
JEP 0.865734
JMD 180.925476
JOD 0.816406
JPY 183.220375
KES 149.234346
KGS 100.698929
KHR 4611.886464
KMF 493.994725
KPW 1036.403966
KRW 1714.0307
KWD 0.353201
KYD 0.958426
KZT 555.408136
LAK 24682.022961
LBP 102995.121174
LKR 358.152334
LRD 210.470063
LSL 19.349464
LTL 3.400091
LVL 0.696533
LYD 7.372077
MAD 10.805486
MDL 20.012126
MGA 4788.142922
MKD 61.653234
MMK 2418.334396
MNT 4116.047513
MOP 9.275872
MRU 45.857361
MUR 53.68307
MVR 17.80246
MWK 1994.007542
MXN 20.353348
MYR 4.511602
MZN 73.586935
NAD 19.349464
NGN 1575.601776
NIO 42.322837
NOK 11.08236
NPR 169.747291
NZD 1.972077
OMR 0.442684
PAB 1.150191
PEN 3.970264
PGK 4.959556
PHP 68.741757
PKR 321.293307
PLN 4.26821
PYG 7465.417237
QAR 4.204128
RON 5.094269
RSD 117.401537
RUB 94.518744
RWF 1678.605284
SAR 4.321598
SBD 9.271517
SCR 16.144156
SDG 692.054169
SEK 10.733385
SGD 1.471432
SHP 0.863926
SLE 28.330837
SLL 24146.471141
SOS 656.152919
SRD 43.263728
STD 23833.803528
STN 24.547513
SVC 10.064174
SYP 127.674013
SZL 19.33492
THB 37.259785
TJS 11.041287
TMT 4.036021
TND 3.397187
TOP 2.772544
TRY 50.902244
TTD 7.79986
TWD 36.722026
TZS 3002.549389
UAH 50.705321
UGX 4342.272682
USD 1.151504
UYU 46.75888
UZS 13906.49396
VES 513.854247
VND 30264.398299
VUV 137.705052
WST 3.171483
XAF 657.211941
XAG 0.014246
XAU 0.000229
XCD 3.111996
XCG 2.072849
XDR 0.817361
XOF 657.211941
XPF 119.331742
YER 274.636692
ZAR 19.256299
ZMK 10364.926801
ZMW 22.398673
ZWL 370.78375
  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSC

    0.0000

    22.99

    0%

  • BCC

    1.7200

    71.72

    +2.4%

  • RYCEF

    0.3800

    16.5

    +2.3%

  • GSK

    0.3800

    53.77

    +0.71%

  • RIO

    2.0300

    89.86

    +2.26%

  • VOD

    0.1900

    14.6

    +1.3%

  • RELX

    0.3300

    34.47

    +0.96%

  • BCE

    0.6521

    25.9

    +2.52%

  • JRI

    -0.0500

    12.54

    -0.4%

  • CMSD

    -0.0400

    22.95

    -0.17%

  • BTI

    1.0100

    60.94

    +1.66%

  • NGG

    -0.0100

    90.89

    -0.01%

  • BP

    0.2300

    42.9

    +0.54%

  • AZN

    2.1100

    192.01

    +1.1%

NASA eyes two more dates in September for possible Moon launch
NASA eyes two more dates in September for possible Moon launch / Photo: CHANDAN KHANNA - AFP/File

NASA eyes two more dates in September for possible Moon launch

NASA is looking at September 23 and September 27 as possible dates for its next attempt at launching its Artemis 1 mission to the Moon, senior official Jim Free told reporters Thursday.

Text size:

Two previous attempts were scrapped after the giant Space Launch System rocket experienced technical glitches including a fuel leak.

The launch window for the 23rd would open at 6:47am (1047 GMT), while the 27th would open at 11:37am (1537 GMT), added Free, associate administrator for the agency's exploration systems development directorate.

The dates were chosen to avoid a conflict with the DART mission, in which a probe will strike an asteroid on September 26 to test its ability to divert the object.

Both missions require use of an international array of antennas called the Deep Space Network.

The launch dates still depend, however, on NASA receiving a special waiver to avoid retesting batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

If it does not receive the waiver, the rocket will have to be wheeled back to its assembly building, pushing the timeline back several weeks.

Mike Bolger, exploration ground systems manager, added that teams were working to replace seals to fix the hydrogen leak issue -- work that could be completed by the end of Thursday, which would pave the way for a tanking test on September 17.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Once launched, it will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach.

The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last several weeks, and one of its main objectives is to test the capsule's heat shield, which at 16 feet (5 meters) in diameter is the largest ever built.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface, while the third -- set for the mid-2020s -- would see the first woman and person of color on lunar soil.

NASA wants to build a lunar space station called Gateway and keep a sustained presence on the Moon to gain insight into how to survive very long space missions, ahead of a mission to Mars in the 2030s.

S.Fujimoto--JT