The Japan Times - NASA postpones rocket launch to Moon after fuel leak

EUR -
AED 4.241501
AFN 76.225899
ALL 93.554047
AMD 421.168408
AOA 1060.230438
ARS 1715.656895
AUD 1.639343
AWG 2.078882
AZN 1.960998
BAM 1.957978
BBD 2.319179
BDT 142.188136
BHD 0.434183
BIF 3417.00026
BMD 1.154934
BND 1.477844
BOB 13.673207
BRL 5.867647
BSD 1.151481
BTN 109.772084
BWP 15.700461
BYN 3.349625
BYR 22636.715706
BZD 2.315876
CAD 1.618352
CDF 2627.475914
CHF 0.931576
CLF 0.027214
CLP 1074.552598
CNY 7.797307
CNH 7.795773
COP 3581.683414
CRC 522.981641
CUC 1.154934
CUP 30.605764
CVE 110.387769
CZK 24.225868
DJF 205.048047
DKK 7.475152
DOP 66.804297
DZD 153.472687
EGP 58.835639
ERN 17.324017
ETB 184.006946
FJD 2.556967
FKP 0.856809
GBP 0.855893
GEL 3.020138
GGP 0.856809
GHS 13.460971
GIP 0.856809
GMD 84.891799
GNF 10108.242008
GTQ 8.785771
GYD 240.867884
HKD 9.057285
HNL 30.853314
HRK 7.54669
HTG 150.557444
HUF 363.867906
IDR 20822.313646
ILS 3.537506
IMP 0.856809
INR 110.16978
IQD 1508.477672
IRR 1588179.269833
ISK 142.219015
JEP 0.856809
JMD 182.292739
JOD 0.818845
JPY 181.57706
KES 148.945652
KGS 100.999312
KHR 4659.181767
KMF 493.156852
KRW 1666.524381
KWD 0.357037
KYD 0.959567
KZT 545.626826
LAK 26077.001864
LBP 103117.983955
LKR 386.549906
LRD 207.841153
LSL 19.045882
LTL 3.410221
LVL 0.698608
LYD 7.367194
MAD 10.756663
MDL 20.122379
MGA 4924.476818
MKD 61.593502
MMK 2424.850425
MNT 4151.45627
MOP 9.302246
MRU 46.277468
MUR 54.282161
MVR 17.855218
MWK 1996.620567
MXN 20.037155
MYR 4.71814
MZN 73.811907
NAD 19.045882
NGN 1575.746553
NIO 42.37713
NOK 11.066871
NPR 175.635335
NZD 1.957192
OMR 0.444134
PAB 1.151481
PEN 3.90234
PGK 5.155734
PHP 70.745488
PKR 319.79146
PLN 4.307178
PYG 6865.635703
QAR 4.209281
RON 5.253334
RSD 117.520702
RUB 91.505504
RWF 1690.379977
SAR 4.325144
SBD 9.333147
SCR 15.60035
SDG 692.961179
SEK 11.020558
SGD 1.479777
SLE 28.523045
SOS 658.031838
SRD 43.635158
STD 23904.811825
STN 24.527278
SVC 10.075205
SZL 19.043179
THB 38.719182
TJS 10.62802
TMT 4.05382
TND 3.385065
TRY 54.854577
TTD 7.818696
TWD 37.31489
TZS 3050.792978
UAH 51.393558
UGX 4323.808778
USD 1.154934
UYU 46.331528
UZS 13783.329302
VES 861.230481
VND 30375.354155
VUV 137.078995
WST 3.158158
XAF 656.687343
XAG 0.020053
XAU 0.000285
XCD 3.121268
XCG 2.075208
XDR 0.816708
XOF 656.687343
XPF 119.331742
YER 275.221161
ZAR 19.011665
ZMK 10395.793255
ZMW 21.630056
ZWL 371.88843
  • CMSD

    0.0900

    22.11

    +0.41%

  • CMSC

    0.0300

    21.84

    +0.14%

  • BCE

    -0.0200

    21.68

    -0.09%

  • RYCEF

    -0.3100

    19.55

    -1.59%

  • GSK

    -0.3800

    51.69

    -0.74%

  • BCC

    1.0000

    76.38

    +1.31%

  • NGG

    -0.4200

    79.97

    -0.53%

  • RIO

    -0.3300

    96.85

    -0.34%

  • RBGPF

    0.0000

    69.21

    0%

  • AZN

    -1.7000

    169.64

    -1%

  • BTI

    -1.0400

    60.65

    -1.71%

  • JRI

    0.0900

    12.96

    +0.69%

  • VOD

    -0.3600

    15.78

    -2.28%

  • RELX

    -1.1900

    35.42

    -3.36%

  • BP

    1.0000

    45.22

    +2.21%

NASA postpones rocket launch to Moon after fuel leak
NASA postpones rocket launch to Moon after fuel leak / Photo: CHANDAN KHANNA - AFP

NASA postpones rocket launch to Moon after fuel leak

NASA on Saturday scrapped a second attempt to get its new 30-story rocket off the ground and send its uncrewed test capsule toward the Moon after engineers detected a fuel leak.

Text size:

With millions around the globe and hundreds of thousands on nearby beaches waiting for the historic launch of the massive Space Launch System (SLS), a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in.

"The launch director waived off today’s Artemis I launch," NASA said in a statement. "Multiple troubleshooting efforts to address the area of the leak... did not fix the issue."

Though the area around the launch site was closed to the public, an estimated 400,000 people had gathered nearby to see -- and hear -- the most powerful vehicle that NASA has ever launched climb into space.

The initial launch attempt on Monday was also halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

Early Saturday, launch director Charlie Blackwell-Thompson had given the go-ahead to start filling the rocket's tanks with cryogenic fuel.

About three million liters of ultra-cold liquid hydrogen and oxygen were due to be pumped into the spacecraft, but the process soon hit problems.

No new date for another try was immediately announced.

After the latest delay, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19, due to the Moon's position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

- Apollo's twin sister -

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A government audit estimates the Artemis program's cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

K.Hashimoto--JT