The Japan Times - Kenya, Uganda open rail extension burdened by Chinese debt

EUR -
AED 4.072631
AFN 72.082457
ALL 90.411931
AMD 399.756294
ANG 1.984791
AOA 1018.021125
ARS 1717.476479
AUD 1.618641
AWG 1.996119
AZN 1.883348
BAM 1.947476
BBD 2.249784
BDT 139.264755
BGN 1.938266
BHD 0.421399
BIF 3341.517691
BMD 1.108955
BND 1.428054
BOB 13.247378
BRL 6.163461
BSD 1.117026
BTN 104.97631
BWP 15.324225
BYN 3.34464
BYR 21735.52008
BZD 2.246498
CAD 1.579346
CDF 2567.230885
CHF 0.923377
CLF 0.027728
CLP 1091.311732
CNY 7.397119
CNH 7.398683
COP 3669.022327
CRC 505.240502
CUC 1.108955
CUP 26.808416
CVE 109.795711
CZK 24.384478
DJF 198.90982
DKK 7.475616
DOP 67.753159
DZD 151.735048
EGP 59.338855
ERN 16.634327
ETB 181.805527
FJD 2.512451
FKP 0.832477
GBP 0.835326
GEL 2.886177
GGP 0.832477
GHS 13.080093
GIP 0.832477
GMD 82.062482
GNF 9895.703801
GTQ 8.535632
GYD 234.05538
HKD 8.700668
HNL 30.026878
HRK 7.506528
HTG 146.420113
HUF 364.632598
IDR 20166.348605
ILS 3.525662
IMP 0.832477
INR 103.944636
IQD 1693.430659
IRR 2113751.603665
ISK 136.745462
JEP 0.832477
JMD 177.28226
JOD 0.78621
JPY 177.096247
KES 144.164089
KGS 96.977681
KHR 4555.44696
KMF 490.158153
KPW 998.059553
KRW 1482.002352
KWD 0.345306
KYD 0.930859
KZT 498.698464
LAK 25142.53582
LBP 100027.960675
LKR 371.223318
LRD 189.896052
LSL 18.312429
LTL 3.274456
LVL 0.670796
LYD 7.160395
MAD 10.896128
MDL 20.073018
MGA 5054.396508
MKD 61.554164
MMK 2328.523545
MNT 3996.068676
MOP 9.025689
MRU 45.060403
MUR 52.309345
MVR 17.104169
MWK 1936.921215
MXN 20.649537
MYR 4.516336
MZN 70.85982
NAD 18.312429
NGN 1492.819456
NIO 41.104312
NOK 10.585825
NPR 167.95908
NZD 1.991633
OMR 0.426393
PAB 1.117026
PEN 3.806829
PGK 5.016558
PHP 70.236783
PKR 306.704632
PLN 4.411425
PYG 6895.527151
QAR 4.071796
RON 5.34727
RSD 117.605763
RUB 91.7396
RWF 1652.703084
SAR 4.161424
SBD 8.972276
SCR 15.421044
SDG 667.034305
SEK 11.076815
SGD 1.424447
SHP 0.830958
SLE 25.405147
SLL 23254.238975
SOS 638.36001
SRD 41.747754
STD 22953.131725
STN 24.395728
SVC 9.774223
SYP 14418.63394
SZL 18.317953
THB 37.431119
TJS 10.26514
TMT 3.881343
TND 3.329071
TOP 2.670097
TRY 55.705271
TTD 7.57562
TWD 36.50381
TZS 2936.984468
UAH 50.805049
UGX 4557.520255
USD 1.108955
UYU 45.19682
UZS 13375.829056
VES 998.603538
VND 28449.68877
VUV 132.871883
WST 3.090723
XAF 655.957
XAG 0.021186
XAU 0.000276064467
XCD 2.997007
XCG 2.013078
XDR 0.784089
XOF 655.957
XPF 119.331742
YER 262.273308
ZAR 18.39899
ZMK 9981.918073
ZMW 22.758725
ZWL 357.083092
SSP 6371.387902
MXV 2.320176
  • RYCEF

    0.1000

    19.81

    +0.5%

  • VOD

    -0.2500

    16.33

    -1.53%

  • CMSC

    -0.2800

    20.12

    -1.39%

  • RBGPF

    -2.0000

    65

    -3.08%

  • RIO

    -0.2500

    94.16

    -0.27%

  • BTI

    -1.2000

    54.85

    -2.19%

  • NGG

    -0.3000

    74.94

    -0.4%

  • GSK

    -0.3500

    49.35

    -0.71%

  • BCE

    -0.4200

    20.14

    -2.09%

  • CMSD

    -0.3400

    19.93

    -1.71%

  • BP

    -0.9100

    43.52

    -2.09%

  • RELX

    0.1700

    33.24

    +0.51%

  • BCC

    -0.6200

    75.97

    -0.82%

  • AZN

    -1.9400

    164.21

    -1.18%

  • JRI

    0.0000

    10.77

    0%

Kenya, Uganda open rail extension burdened by Chinese debt
Kenya, Uganda open rail extension burdened by Chinese debt / Photo: SIMON MAINA - AFP/File

Kenya, Uganda open rail extension burdened by Chinese debt

The presidents of Kenya and Uganda met near their shared border Saturday to mark the multi-billion-dollar, long-delayed extension of a Chinese-built railway that has left Kenya heavily in debt.

Text size:

The Standard Gauge Railway, built from 2013 to 2019, connects the Kenyan port of Mombasa to its capital Nairobi, and on to the lake town of Naivasha, but China refused further lending before it could be extended to Uganda as planned.

Kenya now spends roughly $1 billion a year servicing Chinese debt, most of it borrowed to build the railway.

That is far more than the line generates in revenue -- around $165 million last year -- even if passenger and cargo numbers have been growing strongly over the past year.

A report by Kenya's auditor general last year found more than $260 million had been wasted just on penalties and interest from late debt payments.

Yet despite the controversy over the cost, Kenya has been keen to finish the line.

Kenyan President William Ruto said the rail link will "define generations", speaking at a ceremony in grand pomp and circumstance with his Ugandan counterpart Yoweri Museveni in Kisumu, near the Kenya-Uganda border.

Ruto argued the line would slash logistics costs that "undermine competitiveness" in east Africa.

If the ambitious building schedule is to be believed, the line is due to reach Kisumu by June 2027. The next phase will then take the line to Malaba, a town on the border.

"Cargo takes an average of 80 hours to move from Mombasa to Malaba and more than 100 hours to reach Kampala," the Ugandan capital, Ruto said.

"We cannot build prosperity on inefficiency."

- 'Irrational and wasteful' -

Museveni said the line would reduce the inefficiencies in his own country's infrastructure.

"The railway is part of the rationalisation of our transport system, especially on the Uganda side, which is irrational and wasteful," the veteran leader told the ceremony.

Ruto broke ground on the next phase in Narok County on Thursday, arguing that it will create jobs and reduce road congestion.

"We have thought through this project (and)... its finance," he insisted.

Treasury estimates say the overall cost will be more than 500 billion shillings ($3.9 billion), according to Kenya's Business Daily.

Kenya is not taking more cash from Chinese banks this time -- instead borrowing against future cargo taxes -- though it is partnering with Chinese transport firms to build the new phase.

China lent Kenya $9.7 billion between 2000 and 2019, according to the Chinese Loans to Africa Database by Boston University, with around half of that going to the railway.

It stopped lending from 2020 to 2023 as Kenya struggled to make repayments, at a time when China revised its broader lending strategy in Africa.

Kenya considers the railway extension crucial for strengthening trade through east and central Africa, hoping to reach landlocked countries such as Uganda, Rwanda, South Sudan and the mineral-rich Democratic Republic of Congo.

K.Inoue--JT